page-6016-4016

Technology platform

 

Having independent intellectual property rights of the core technology is one of the powerful factors for TOP-RANK to participate in the international market competition. We emphasize the importance of technological innovation in terms of ideology and guarantee the investment of R & D expenses in terms of system.

 

we stick to the implementation of the R & D reserve fund system, and allocate a large portion of the costs to the R & D budget every year.

 

Electrodes Technology 

Hydrogel Technology

 

 

 

business model

 

 

Custom Electrical Stimulation Pads
CDMO Service
page-626-417
ODM Solution
page-496-372
OEM Manufacturing

 

 

 

 

R&D capabilities

 

 

page-6016-4016
01

Expert Team

Our team of R&D engineers, with over a decade of experience, along with a dedicated polymer medical hydrogel materials technology R&D group, possesses the expertise to handle design development from scratch to mass production.

02

Research Center

TOP-RANK has two R&D testing centers. As a professional electrode pad supplier, our proprietary electrode patch product testing labs enable us to quickly verify and analyze product solutions. As a China conductive hydrogel manufacturer, we have advanced hydrogel material research labs for rapid sample testing and analysis.

►view more

page-1666-973
page-800-450
03

R&D Investment

In partnership with top-tier third-party research institutions, we invest over 10% of our annual revenue in R&D, which is increasing year by year, continuously driving technological innovation.

04

Development Outcome

TOP-RANK hold over 60 patents and have comprehensively passed certifications including CE, FDA, UKCA, and CFDA, adhering to the ISO13485 and MDSAP system certifications.

►view more

page-800-450

 

Technical Capability

Structural Design Capability

  • Product Structural Design Product
  • Assembly Tool Design Capability
  • Prototyping and Sampling
 

Mold Verification and Confirmation

  • Mold flow analysis
  • Price/risk analysis
  • Supplier selection
  • Mold confirmation
  • Part confirmation
 

Performance Testing Capabilities

  • Initial Adhesion Testing Holding
  • Adhesion Testing Peel Strength Testing
  • Conductivity Testing Viscosity Testing
  • Impedance Testing Leakage Current
  • Testing Dielectric Strength Testing
  • Medical Environment Testing Electrode
  • Surface Temperature Rise Testing